CAPITAL REQUEST Controlling Board No.
CCC0100113
Status:  Approved
Meeting Date:  12/4/2017

GENERAL INFORMATION

Agency
Cuyahoga Community College


Division/Institution
Cuyahoga Community College

Eligible for Local Administration?
Yes
Real Estate Acquisition
    Release of Capital Funds(R.C.Sec. 127.14G) and/or R.C.126.14
    Transfer of Capital Funds (R.C.Sec. 127.14G and/or Sec. 127.15)
    Higher Education Authorization Request (Sec. 3333.071)
    Other Statutory Authority/Bill Section:
Fiscal Year(s)
2018
Bill No.
SB 310
Eligible for OBM
Director Approval?
No
Capital Request
    Release of Capital Funds (R.C.Sec. 127.14G)
    Transfer of Capital Funds (R.C.Sec. 127.14G and/or Sec. 127.15)
    Waiver of Competitive Selection (R.C.Sec. 127.16B)
      No Competitive Opportunity
      Agency Released Competitive Opportunity
    Agency Released Competitive Opportunity (R.C.Sec. 127.162)
    Release Percent for Arts (R.C.Sec. 3379.10)
    Other Statutory Authority/Bill Section:
    Other:

VENDOR INFORMATION
For FYAmountNameAddressCounty
CCC01 2018 $190,000.00 Cold Harbor Building Company 115 INDUSTRIAL PKWY
CHARDON, OH 44024
Geauga

TRANSFER INFORMATION
FromToFYFund GroupFund CodeAppropriation Line ItemAppropriation Line Item NameTransfer AmountPrev Rel Amount
         

FUNDING INFORMATION
Fund GroupFund CodeAppropriation Line ItemAppropriation Line Item NameTotal Amount
7034 C37838 Structural Concrete Repairs $190,000.00

SIGNATURES
     
Cynthia Leitson 12/04/2017
   
Agency Director or Authorized Agent On The Date Of
   
10/30/2017 Christine Morrison
   
Date Controlling Board President/OBM Director
   
AGENCY CONTACT
Name:  Nancy Stopp Title:  Contracts Manager
Phone:  (216) 987 - 3441 Fax:  (216) 987 - 4758 E-Mail:  Nancy.stopp@tri-c.edu
REQUIRED EXPLANATION OF REQUEST
  Cuyahoga Community College respectfully requests Controlling Board approval to release capital appropriation in the amount of $190,000.00 from Fund 7034, ALI C37838 (Structural Concrete Repairs, Metropolitan Campus), in FY18, and an agency released competitive opportunity per R.C. 127.162 to amend the contract with Cold Harbor Building Co., Chardon, Ohio for Structural Concrete and Electrical Repairs, Metropolitan Campus, Cuyahoga County.  
  The Metropolitan Campus of Cuyahoga Community College is the College's oldest campus, with the original facilities dating back to 1963. This campus has an extensive underground parking structure below all the original buildings and the Plaza that provides pedestrian linkage to all the buildings entries. This concrete structure has experienced significant deterioration, despite our rigorous attempts to address repairs. Problems exist with the condition of the concrete decking, the concrete structure, the water tightness of the plaza, and its expansion joints. The parking garages located below the plaza utilizes a transite lay-in panel ceiling system that is deteriorating and will need to be replaced in the areas of work covered by this project.

At the April 10, 2017 Controlling Board Meeting, the Board approved the award of a construction contract to Cold Harbor Building Company in the amount of $8,400,000.00 to renovate the Northeast quadrant of the Metro Campus. In-scope demolition of the Plaza deck has uncovered significant structural deterioration of the underlying reinforced concrete members which is beyond the scope of repairs anticipated by the initial contract and which exceeds available contingency funding. Additionally, electrical service in the garage requires upgrade, including complete replacement of the antiquated main electrical panel, in order to support installation of the new fire suppression and associated controls system called for in the drawings and required to meet life safety code. This too represents an unforeseen condition beyond the scope of the contract and the available contingency funding.   Therefore, the College is requesting this increase in contingency for Cold Harbor Building Company to increase their scope of work to affect structural repairs to the Plaza Deck and to upgrade electrical service in the garage.

The project architect completed bid documents and the College advertised for bids. In accordance with the Ohio Revised Code 153.01 the College received the bids and the College Board of Trustees approved the award of a contract to the contractor in the project budget whose bid is the lowest responsive and responsible bid received.

Cold Harbor Building Company 0000067294
 
  CCC0100107 Controlling Board approved Construction Contract

 
Attachments Controlling Board Request No.: CCC0100113
Attachment TypeAttachment Description
Private Business Use Report Private Business Use Report
Other EDGE/MBE
Other Architect Letter Of Support
 
Release and Permit Information
NameFYAmountR & P #R & P DateIssued ByComments
Cold Harbor Building Company 2018 $190,000.00

Capital Request Required Information
Amendments to Architect, Engineering or Other Professional Service Contracts/ Construction Manager at Risk or Design-Build Contracts including Guaranteed Maximum Price Amendments - Cold Harbor Building Company
Controlling Board Request No.: CCC0100113
1.
Type of service to be provided: Construction Services
   
2. Identify the supplier and location of supplier's principal place of business.
Cold Harbor Building Company
115 INDUSTRIAL PKWY
CHARDON, OH 44024
County: Geauga
3. Explain why the contract is being amended.
  Increase in Scope of work to affect structural repairs to the Plaza Deck and upgrade electrical service to the garage. In scope demolition has uncovered significant structural deterioration of the underlying reinforced concrete members which is beyond scope of initial contract. The electrical panel must be updated to support installation of the new fire suppression.
4. What is the effect of the contract amendment on the project?
This amendment will allow Cuyahoga Community College to increase the scope of work to address the urgent repairs needed due to significant deterioration and antiquated electrical panel.
5. Provide the dates of previous Controlling Board approvals for this contract. Indicate whether the approvals were for the initial contract or previous amendments to this contract. In addition, provide the information regarding the contract amount(s) depending upon the type of contract previously approved by the Controlling Board.
 
CB Approval DateType of ContractAmount per FY# of HoursRate per Hour per FY
04/10/2017 Initial $8,400,000.00 0.00 $0.00
   
6. In addition to the revised project budget, provide a revised fee analysis which includes the following:
   
Fee Analysis Previous Contract Amount Previous Percent of Total Construction Cost Revised Contract Amount Revised Percent of Total Construction Cost
Professional Design Services and/or Construction Management Services/Design-Build   $0.00   0%   $0.00   0%
Personnel Cost   $403,000.00   5%   $593,000.00   7%
Testing & Special Instructions   $0.00   0%   $0.00   0%
General Conditions   $0.00   0%   $0.00   0%
Design Services Fees(A/E of Record in Design-Build Contract only)   $0.00   0%   $0.00   0%
Other   $0.00   0%   $0.00   0%
Refer to the requirements of Revised Code Sections 153.65-153.70.
7.
Provide the following employee information: Nationwide Ohio
Total Number of Employees 13    13   
Percentage of Women 20% 20%
Percentage of Minorities 0% 0%